[1]
2025. A Hybrid Monte Carlo-AHP Based Model For Integrated Risk Management of Material Delivery Delays In Construction Supply Chain. Fusion Journal of Engineering and Sciences. (Oct. 2025). DOI:https://doi.org/10.64615/fjes.1.SpecialIssue.2025.30.